Site Requirements

Updated March 9, 2021. Written for LMS Version 6.2.

The following site requirements are for physical Lantronix Control Centers running on Dell servers.

Ensure that the power source:

  • Provides the appropriate line voltage and frequency - 100 to 240 VAC, 50/60 Hz
  • Provides overload protection
  • Is connected to earth ground
The power source must meet all these requirements to ensure safe and reliable operation.

Ensure that the installation site meets these requirements:

  • Ambient temperature does not exceed 95 °F (35 °C)
  • The site provides at least 3 inches (8 cm) clearance beyond the appliance's ventilation openings
The unit will overheat if the site does not meet these requirements.